LID: Whittenburg Residence

Whittenburg Residence, Cowan Heights

  • The Project: BMPs installed on property were two dry wells that intercepted existing landscape drains and are designed to irrigate parkway when they overflow and one rain barrel.
  • Who made it happen? Stivers and Associates, Inc.
  • Completed: April of 2009
  • Total Project Cost: $8,320.00
  • Stormwater Capture Capacity: 2,050 gal/yr