LID:Marks Residence

Marks Residence, Huntington Beach, CA

  • The Project: BMPs installed at the Marks property were two detention basins.
  • Who made it happen? Homeowner
  • Completed: May 2009
  • Total Project Cost: $3,355.00
  • Stormwater Capture Capacity: 961 gal/yr

During the Project: